Oillinko

Product information

Well testing packages

Temporary or permanent equipment for measuring well production under defined test conditions.

About well testing packages

Well-testing packages combine equipment that separates, measures or handles production during a defined test. The package configuration depends on fluid phases, expected rates and the information required from the test programme.

Typical applications

Temporary testing and permanent measurement installations use combinations of separators, meters and handling equipment. Test duration and site constraints affect the complete scope.

Types and configuration choices

Define flow cases, pressure, temperature and measurement targets. Equipment rental, operating crew, fluid handling and interpretation should be identified separately from hardware supply.

Expected rates and phases

Performance requirements should describe the intended operating cases rather than a single headline rating. State the units and distinguish normal demand from minimum, maximum and temporary conditions where they apply. Include the duration or frequency of intermittent duties, because a continuously operating assembly and an occasionally used one may need different configurations. Record which loads or consumers operate together. This provides a consistent basis for comparing proposals and helps identify whether an offer includes the full performance range required by the application.

Pressure and temperature

Operating conditions establish the environment in which the selected equipment or service must perform. Distinguish routine conditions from the design limits stated in the project documentation, and include startup or shutdown cases where the responsible design requires them. Use explicit units and identify the measurement reference. For an existing installation, check current records rather than copying an old nameplate without review. A proposed configuration should be assessed against the complete documented envelope, with any exceptions made visible in the technical response.

Test duration

The required evidence should relate to the actual purpose of the item or assignment. Identify the method, acceptance basis and documents required by the project, including the relevant edition or revision where specified. A certificate title alone may not establish that the required scope or measurement range is covered. Distinguish manufacturer records, calibration results, inspection reports and specialist qualifications. State whether witnessing or independent review is required, and make the responsibility for evaluating the results clear before comparing technical and commercial proposals.

Measurement and safety scope

A clear scope describes the intended result and the responsibilities of the parties involved. List the required deliverables and identify which design or operating decisions have already been made. Separate investigation, engineering, supply, installation and acceptance activities where they are different work packages. State the review process and the information that will be provided by the buyer or operator. This allows proposals to address the same work and makes omissions or additional services visible before a commitment is made.

How related requirements differ

Wellheads and Christmas trees: Wellheads provide the surface interface for well tubulars and pressure containment. Christmas trees are valve and connection assemblies used to manage production or injection at a completed well's outlet. Pressure designation, bore, material requirements and connection arrangement vary by well. The control, monitoring and documentation scope should be included with the mechanical specification.

Chokes and production manifolds: Production chokes restrict flow through a selected trim arrangement, while manifolds combine valves and connections to direct streams. Their pressure-containing design and flow-control roles depend on the wellsite or production system. Fixed or adjustable chokes and different manifold layouts serve different objectives. Specify flow cases, pressures, materials, end connections and required actuation.

Production spares and seal kits: Production spares and seal kits replace components in installed wellsite or production equipment. Kits may contain multiple seals and supporting parts selected for a particular assembly and material configuration. Use manufacturer, serial number, drawing and kit reference to identify the requirement. Check revision, storage life and inspection documentation rather than assuming dimensional similarity establishes interchangeability.

Compare the complete supply scope

For well testing packages, compare the complete assembly and documented scope of supply. An offer for a component may exclude the drive, controls, fittings, accessories or inspection services needed for the installation. List exclusions and proposed alternatives so each quotation can be assessed against the same requirement. Manufacturing origin, delivery location and the supplier's business address are separate facts. If a particular origin is required, request confirmation for the actual offered item and the supporting documentation specified by your project.

Questions before requesting a quotation

What information should be available first? Start with the intended application and the current technical specification for well testing packages. In this category, the initial review includes expected rates and phases, pressure and temperature, test duration, measurement and safety scope. Attach the relevant drawings or scope documents and identify any information still awaiting confirmation. This makes it possible to distinguish a preliminary enquiry from a fully defined purchasing or service requirement.

Can an alternative be accepted on size or price alone? A proposed alternative needs review against the required function, materials, interfaces and documented performance. Similar dimensions or a familiar brand name do not establish compatibility. State which requirements are mandatory and where an equivalent may be considered. Availability, lead time and supporting documents are confirmed for the actual offer rather than assumed from this catalogue.

Enquire about well testing packages

Send your specification or service scope to Oillinko. Our team reviews your request and contacts you to clarify the next steps.

Your enquiry goes to the Oillinko team. We review your requirements and coordinate sourcing with you.

Excel, PDF or Word — your BOQ, specification or service scope (optional)